Rajasthan Rajya Vidyut Utpadan Nigam Limited (RRVUNL) submitted petition 2435/2026 to RERC to allow additional capitalisation on account of Renovation and Modernisation (R&M), or special allowance as an alternative, for generating stations that have exhausted their useful life.
RRVUNL has several plants, including 1350 MW of coal-based TPPs, which have exhausted their useful life, and have also operated well beyond it. Given that such provisions exist in the Regulations stipulated by CERC and other State ERCS, and since older TPPs have a key role to play in the context of the state’s energy transition, this is a step in the right direction. Prayas (Energy Group) had the following inputs towards the effective and transparent implementation of the proposed amendment:
- Ensure that the generation from older plants, operating beyond their useful lives with R&M and LE retrofits, are considered in the state’s Resource Adequacy Plans and mandate that any new RVUITL capacity addition is subject to such RA plans, which should itself be finalised based on public consultation
- Mandate that the evidence of achieving the purpose of undertaking additional capitalisation is demonstrated and certified by the relevant agency before the expenditure is passed through
- Consider the proposed amendment with the additional mandate that additional capitalisation on account of R&M should be based on public consultation on the R&M proposal submitted by the generator